Multivariate model optimisation during the implementation of flexible interconnection projects for MV distribution networks
, , , , and
Mar 17, 2025
About this article
Published Online: Mar 17, 2025
Received: Nov 05, 2024
Accepted: Feb 17, 2025
DOI: https://doi.org/10.2478/amns-2025-0186
Keywords
© 2025 Xing Su et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Figure 1.

Figure 2.

Figure 3.

Figure 4.

Figure 5.

Figure 6.

Figure 7.

Figure 8.

Figure 9.

Figure 10.

Figure 11.

The performance of different policies is the result of the comparison
Scheme | Operating cost/CNY | Voltage deviation/p.u. | Total work loss/kWh |
Initial system | — | 0.0870 | 4865.45 |
Scheme 1 | 1559.5 | 0.081 | 3332.0 |
Scheme 2 | 5543.8 | 0.0746 | 2897.3 |
Scheme 3 | 3696.1 | 0.0685 | 2655.2 |