The production of artifacts is time-consuming and time-consuming (s)
| Link classification | Time consuming before optimization | Optimized after time | 
|---|---|---|
| Workpiece | 26.32 | 11.14 | 
| Workpiece handling and marking | 12.47 | 6.34 | 
| Workpiece to specify position (position) | 38.73 | 18.67 | 
| Placement of workpiece | 5.37 | 2.24 | 
| Workpiece to specify position (position) | 55.42 | 24.36 | 
| Grab the workpiece to the processing center | 28.75 | 13.28 | 