Stochastic Model Based Optimisation Path Study of Off-grid Optical Storage Microgrid Configuration and Economy
, , , , and
Mar 17, 2025
About this article
Published Online: Mar 17, 2025
Received: Oct 13, 2024
Accepted: Jan 26, 2025
DOI: https://doi.org/10.2478/amns-2025-0184
Keywords
© 2025 Kan Feng et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Figure 1.

Figure 2.

Wind speed, light intensity, temperature and latency load in a region
Time | Wind speed (m/s) | Illumination intensity (°/ |
Ambient temperature (°C) | Latency load (kW) |
January | 3.23 | 2.4 | -7.5 | 51.7 |
February | 4.38 | 2.85 | -4.6 | 45.5 |
March | 3.6 | 3.15 | 2.5 | 48.7 |
April | 2.94 | 4.02 | 9.4 | 50.7 |
May | 2.88 | 4.17 | 13.6 | 45.8 |
June | 2.72 | 6.91 | 22.7 | 49.8 |
July | 2.84 | 6.16 | 25.9 | 48.2 |
August | 4.1 | 6.01 | 22.8 | 51.6 |
September | 3.81 | 5.32 | 19.2 | 48 |
October | 4.02 | 4.87 | 8.9 | 48.5 |
November | 4.28 | 4.73 | -0.4 | 45.8 |
December | 4.21 | 4.51 | -5.8 | 50.9 |
Cost parameters of the net type optical storage micronet equipment
Device name (yuan/kW) | Installation cost | Replacement cost | Operating maintenance cost | Service life (Year) | Fuel cost |
Wind generator (WT) | 15000 | —— | 0.09% | 25 | —— |
Photovoltaic cell (PV) | 14500 | —— | 0.05% | 25 | —— |
Photovoltaic MPPT | 700 | —— | 0.06% | 25 | —— |
Diesel generator (Gen) | 850 | 590 | 0.74 yuan/h | 17500h | 5.08 yuan/L |
Fuel cell (FC) | 16800 | 14200 | 0.19 yuan/h | 55000h | —— |
Electrolytic cell (ELE) | 7840 | —— | 0.03% | 25 | —— |
Hydrotank (HT) | 2600 | —— | 0.78% | 25 | —— |
Flow converter | 4800 | —— | 0.98% | 25 | —— |
Accumulator | 1500 | 950 | 1.15% | 3 | —— |
Gas boiler | 600 | —— | 1.5% | 25 | 3.52 yuan/ |
Microgrid controller | 18000 | —— | 0.95% | 25 | —— |
Optimize the configuration results of the energy storage system
Scheme type | WT | PV (kW) | MPPT (kW) | Gen (kW) | Battery | Converter (kW) | FC (kW) | ELE (kW) | HT (kg) |
A1 | 55 | —— | —— | —— | 2500 | 356.1 | —— | —— | —— |
B1 | 55 | —— | —— | —— | 2900 | 334.8 | —— | —— | —— |
A2 | —— | 450 | 450 | —— | 2900 | 85.9 | —— | —— | —— |
B2 | —— | 450 | 450 | —— | 3200 | 83.1 | —— | —— | —— |
A3 | 18 | 320 | 320 | —— | 2400 | 95.4 | —— | —— | —— |
B3 | 18 | 320 | 320 | —— | 2500 | 91.8 | —— | —— | —— |
A4 | 15 | 290 | 290 | 40 | 600 | 102.3 | —— | —— | —— |
B4 | 15 | 290 | 290 | 40 | 1200 | 98.7 | —— | —— | —— |
A5 | 15 | 290 | 290 | —— | 650 | 36.5 | 45 | 18 | 18 |
B5 | 15 | 290 | 290 | —— | 1200 | 58.4 | 45 | 18 | 18 |
Optimize economic indicators
Scheme type | NPC (yuan) | LCOE (yuan) | REU (%) | LLR (%) |
A1 | 24655595.11 | 2.83 | 94.78 | 10.23 |
B1 | 26666925.18 | 2.86 | 94.78 | 10.23 |
A2 | 24184924.71 | 2.44 | 94.78 | 9.26 |
B2 | 24652862.85 | 2.71 | 94.78 | 9.16 |
A3 | 23957793.8 | 2.23 | 94.82 | 6.81 |
B3 | 24080801.53 | 2.3 | 94.82 | 6.34 |
A4 | 17754849.7 | 1.71 | 80.87 | 6.08 |
B4 | 19972982.57 | 1.73 | 81.35 | 5.92 |
A5 | 12169284.2 | 1.51 | 99.86 | 5.49 |
B5 | 13053573.8 | 1.68 | 98.64 | 4.89 |
Comparison of cost changes under different scenarios
Project | Original scene | New scene |
Photovoltaic installation (yuan) | 25481635.52 | 22635487.92 |
Replacement cost (yuan) | 42563.25 | 39425.62 |
Operating maintenance cost (yuan) | 11524.63 | 10524.63 |
Photovoltaic subsidy cost (yuan) | 27846.24 | 25146.62 |
Net loss cost (yuan) | 1852.64 | 1524.28 |
Light storage rate | 13.24% | 16.47% |
Voltage deviation indicator | 0.8215 | 0.7942 |
Net loss index | 0.3265 | 0.3148 |
Wind speed and solar radiation statistics
Season | Wind velocity distribution parameter | Wind velocity wibull distribution parameters | ||
Spring | 2.65 | 5.94 | 2.16 | 0.45 |
Summer | 1.74 | 6.34 | 2.99 | 0.72 |
Autumn | 2.59 | 6.85 | 2.34 | 0.59 |
Winter | 2.74 | 6.92 | 2.07 | 0.45 |
Average annual | 2.43 | 6.51 | 2.39 | 0.55 |