A fast short circuit capacity calculation model based on regression neural network in complex grid environment
, , , , oraz
18 lis 2024
O artykule
Data publikacji: 18 lis 2024
Otrzymano: 23 cze 2024
Przyjęty: 08 paź 2024
DOI: https://doi.org/10.2478/amns-2024-3325
Słowa kluczowe
© 2024 Siyang He et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
He, Siyang
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Zhao, Shiqin
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Wang, Shuai
Tongren Power Supply Bureau, Guizhou Power Grid Co., Ltd.Tongren, China
Huang, Juncheng
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Zhang, Changzi
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Wang, Huaiyuan
Duyun Guiding Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
