A fast short circuit capacity calculation model based on regression neural network in complex grid environment
, , , , and
Nov 18, 2024
About this article
Published Online: Nov 18, 2024
Received: Jun 23, 2024
Accepted: Oct 08, 2024
DOI: https://doi.org/10.2478/amns-2024-3325
Keywords
© 2024 Siyang He et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
He, Siyang
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Zhao, Shiqin
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Wang, Shuai
Tongren Power Supply Bureau, Guizhou Power Grid Co., Ltd.Tongren, China
Huang, Juncheng
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Zhang, Changzi
Duyun Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
Wang, Huaiyuan
Duyun Guiding Power Supply Bureau, Guizhou Power Grid Co., Ltd.Duyun, China
