Open Access

Discussion on Innovative Teaching Methods for Industry-Education Integration in Colleges and Universities in the Context of Interactive Digital Media

, ,  and   
Mar 21, 2025

Cite
Download Cover

Figure 1.

Causality diagram
Causality diagram

Figure 2.

Influence factor frequency - central degree diagram
Influence factor frequency - central degree diagram

Factors for the fusion of production

Primary dimension Secondary dimension
Entrepreneurship will cultivate the dimension Top college vision(A1)
University policy positioning(A2)
High-level entrepreneurship(A3)
Explore dimensions of entrepreneurial practice Funding pressure(A4)
Earnings expectations(A5)
Entrepreneurship(A6)
Construction of entrepreneurship system(A7)
Business operation(A8)
Entrepreneurship ability ascension dimensions Business endowment formation(A9)
Business culture(A10)
Business value presentation(A11)
Create dimensions of entrepreneurial environment Social transformation(A12)
Entrepreneurial policy incentives(A13)
Technical market demand(A14)

The relationship between language variables and fuzzy Numbers

Linguistic Variable The relative value of the three elements
No Influence (0,0.1,0.3)
Very Low Influence (0.1,0.3,0.5)
Low influence (0.3,0.5,0.7)
High Influence (0.5,0.7,0.9)
Very High Influence (0.7,0.9,1.0)

The integrated matrix of the influence of the production and education

Factor A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14
A1 0.094 0.091 0.170 0.121 0.154 0.205 0.158 0.210 0.133 0.156 0.148 0.057 0.054 0.062
A2 0.226 0.111 0.286 0.239 0.270 0.297 0.252 0.316 0.218 0.222 0.270 0.08 0.101 0.102
A3 0.232 0.138 0.187 0.203 0.265 0.309 0.254 0.327 0.246 0.258 0.275 0.086 0.080 0.080
A4 0.173 0.116 0.260 0.146 0.255 0.279 0.236 0.291 0.194 0.216 0.227 0.068 0.079 0.067
A5 0.215 0.145 0.275 0.232 0.191 0.312 0.248 0.322 0.230 0.254 0.249 0.086 0.081 0.080
A6 0.115 0.083 0.164 0.120 0.158 0.131 0.152 0.221 0.147 0.128 0.147 0.050 0.047 0.060
A7 0.155 0.113 0.200 0.212 0.228 0.240 0.132 0.268 0.198 0.173 0.196 0.064 0.062 0.066
A8 0.187 0.167 0.251 0.208 0.274 0.294 0.193 0.226 0.260 0.259 0.27 0.081 0.087 0.088
A9 0.162 0.098 0.186 0.203 0.215 0.229 0.160 0.239 0.137 0.230 0.211 0.058 0.066 0.057
A10 0.143 0.112 0.223 0.210 0.239 0.257 0.169 0.281 0.233 0.153 0.253 0.064 0.066 0.068
A11 0.172 0.132 0.243 0.228 0.259 0.276 0.193 0.299 0.236 0.229 0.180 0.089 0.082 0.082
A12 0.199 0.166 0.216 0.143 0.175 0.204 0.166 0.224 0.143 0.153 0.167 0.048 0.104 0.077
A13 0.186 0.189 0.311 0.268 0.296 0.321 0.250 0.346 0.252 0.259 0.300 0.121 0.073 0.134
A14 0.247 0.220 0.317 0.256 0.315 0.338 0.264 0.364 0.277 0.283 0.311 0.138 0.145 0.079

Indexes and rankings

Factor Influence degree Rank Influence degree Rank Center degree Rank Reason Rank
A1 1.813 13 2.506 10 4.319 13 -0.693 12
A2 2.99 3 1.881 11 4.871 10 1.109 3
A3 2.94 4 3.289 3 6.229 2 -0.349 6
A4 2.607 8 2.789 9 5.396 6 -0.182 5
A5 2.92 5 3.294 4 6.214 3 -0.374 7
A6 1.723 14 3.692 2 5.415 7 -1.969 14
A7 2.307 10 2.827 8 5.134 9 -0.52 10
A8 2.845 6 3.934 1 6.779 1 -1.089 13
A9 2.251 11 2.904 7 5.155 8 -0.653 11
A10 2.471 9 2.973 6 5.444 5 -0.502 8
A11 2.7 7 3.204 5 5.904 4 -0.504 9
A12 2.185 12 1.090 14 3.275 14 1.095 4
A13 3.306 2 1.127 12 4.433 12 2.179 2
A14 3.554 1 1.102 13 4.656 11 2.452 1

Configuration analysis results

Conditional variable Configuration solution
Path 1 Path 2 Path 3 Path 4 Path 5
Enterprise size ¢ © © ¢ ©
Subject type © ¢ ¢
Project driver © ¢ ©
Project action © ©
Item constraint © © © ©
Original coverage 0.280365 0.268541 0.405123 0.111258 0.201543
Unique coverage 0.190365 0.052364 0.025712 0.022365 0.032542
consistency 0.954036 0.903254 0.941985 0.952356 0.905841
Total consistency 0.913259
Total coverage 0.798051

The necessity analysis of individual conditions

Result variable The production of the fusion project has achieved high performance
Conditional variables (“not” for logical operations) Consistency Coverage
Enterprise size Size 0.62414 0.60323
~Size 0.37575 0.59263
Subject type Discipline 0.53368 0.57107
~Discipline 0.46634 0.63545
Project driver Impetus 0.76606 0.89189
~Impetus 0.52205 0.64438
Project action Measure 0.77131 0.87775
~Measure 0.52001 0.65825
Item constraint Restraint 0.79602 0.87487
~Restraint 0.53303 0.70224
Language:
English