Cost management of power grid transmission and substation project based on BIM technology
, , , , oraz
28 kwi 2023
O artykule
Data publikacji: 28 kwi 2023
Zakres stron: 1433 - 1446
Otrzymano: 30 mar 2022
Przyjęty: 15 lip 2022
DOI: https://doi.org/10.2478/amns.2023.1.00045
Słowa kluczowe
© 2023 Songsong Wang et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Wang, Songsong
Hebei Electric Power Engineering Supervision Co., LtdHebei, China
Qiao, Wenxuan
Hebei Electric Power Engineering Supervision Co., LtdHebei, China
Wang, Lei
Hebei Electric Power Engineering Supervision Co., LtdHebei, China
Shen, Zhewei
Hebei Electric Power Engineering Supervision Co., LtdHebei, China
Yang, Pengju
Shanghai Electric Power Design Institute Co., LtdShanghai, China
Bian, Li
Shanghai Electric Power Design Institute Co., LtdShanghai, China