Otwarty dostęp

Analysis of the causes of the influence of the industrial economy on the social economy based on multiple linear regression equation

 oraz   
15 gru 2021

Zacytuj
Pobierz okładkę

Fig. 1

Operation flow chart.
Operation flow chart.

Analysis of variance table

Sources of variation Sum of squares Degrees of freedom The variance
Regression model ESS= (Y^iY¯)2 k (Y^iY¯)2/k
Due to the remaining RSS= (YiY^i)2 n–k–1 (YiY^i)2/(nk1)
Total variable TSS=(YiY¯)2 n–1 (YiY¯)2/(n1)

Weighted average travel time rating table

City Before the construction of high-speed rail After the construction of the high-speed rail Growth probability%
A 119.35 43.76 36.67
B 121.36 62.00 51.08
C 91.84 32.06 34.90
D 117.79 45.79 38.20

Economic potential index analysis results

City Before the construction of high-speed rail After the construction of the high-speed rail Growth probability
A 21.07 96.13 4.56
B 25.98 112.63 4.34
C 27.19 192.26 7.07
D 24.00 168.33 7.01

Comparison of running time before and after construction of high-speed railway

Section Before the construction of high-speed rail After the construction of the high-speed rail
A—B 2 h and 9 min 45 points
A—C 1 h and 08 min 41 points
B—C 2 h and 30 min 1 h and 3 min
A—D 30 per minute 14 points
Język:
Angielski
Częstotliwość wydawania:
1 razy w roku
Dziedziny czasopisma:
Nauki biologiczne, Nauki biologiczne, inne, Matematyka, Matematyka stosowana, Matematyka ogólna, Fizyka, Fizyka, inne