Analysis of the Role of Informative Construction Management System in Improving the Safety of Oil and Gas Pipeline Construction and Its Efficiency

, , ,  oraz   
17 mar 2025

Zacytuj
Pobierz okładkę

Figure 1.

The comprehensive average of the factors of each project
The comprehensive average of the factors of each project

Figure 2.

The relevant matrix of various influencing factors
The relevant matrix of various influencing factors

Item number statistics

Item number Construction 1 Construction 2 Construction 3 Construction 4 Construction 5
Name West-East Gas Pipeline Project Phase I West-East Gas Pipeline Project Phase II West-East Gas Pipeline Project Phase III West-East Gas Pipeline Project Phase IV Shaanxi-Beijing Gas Pipeline Project Phase I
Management type Traditional safety management Traditional safety management Ours Traditional safety management Traditional safety management

Integrated evaluation value ordering

Item number Construction 1 Construction 2 Construction 3 Construction 4 Construction 5
Score 3.897 3.674 3.969 3.281 3.297
Sort 2 3 1 5 4

Safety risk management evaluation index system

Primary indicator Secondary indicator
Risk planning management (RP) Collect the information of the oil and gas pipeline (RP1)
Participants who determine the risk of construction (RP2)
Establish the risk management process planning file (RP3)
Risk identification (RI) Analyze risk categories (RI1)
Determine the risk content and infer the result (RI2)
Report on risk identification (RI3)
Risk analysis (RA) Estimated risk occurrence probability (RA1)
Analyze the scope and severity of risk (RA2)
Analyze risk acceptance (RA3)
Risk response (RR) Collect project status and develop risk response measures (RR1)
Implement the risk response plan (RR2)
Risk monitoring (RM) The risk response measures are performed and the effect (RM1)
Tracking risk dynamic development (RM2)
Analyze risk variation (RM3)
Summary and recommendation (CS) Experience of risk management (CS1)
Technical reserve improvement (CS2)
Organizational culture (CS3)

Total variance interpretation

Constituent Initial eigenvalue Extracting the load of the load
Total Percentage of variance Cumulation Total Percentage of variance Cumulation
1 1.138 63.663 63.663 1.138 63.663 63.663
2 1.099 19.368 83.031 1.099 19.368 83.031
3 1.038 10.77 93.801 - - -
4 0.955 3.125 96.926 - - -
5 0.896 2.896 99.822 - - -
6 0.874 0.178 100 - - -

Pearson correlation test

X1 X2 X3 Y1 Y2
X1 1 - - - -
X2 0.637** 1 - - -
X3 0.553** 0.726** 1 - -
Y1 0.59** 0.717** 0.511** 1 -
Y2 -0.663** -0.595** -0.593** -0.365** 1

Efficiency summary

Decision unit Integrated efficiency Pure technical efficiency Scale efficiency
1 0.737 0.398 0.933
2 0.576 0.765 0.945
3 0.733 0.695 0.935
4 0.545 0.789 0.967
5 1 1 1
6 1 1 1
7 0.866 0.995 0.998
8 0.742 0.703 1
9 1 1 1
10 0.902 1 0.943

KMO and Bartlett tests

Categories Numerical value
KMO sampling availability number 0.933
Bartlett sphericity test Approximate card 2796.33
df 138
p 0.001

The number of actual accidents in the project

Item number Construction 1 Construction 2 Construction 3 Construction 4 Construction 5
Death toll 0 1 0 3 5
Hurt number 4 6 1 7 9
Number of accidents 2 3 1 5 4

Component score coefficient matrix

Potential variable Constituent
1 2
RP 0.211 -0.274
RI 0.129 0.689
RA 0.241 -0.136
RR 0.217 0.389
RM 0.239 -0.161
CS 0.184 -0.32

Descriptive statistics

Variables N Min Max M Std.Dev
X1 10 15 196 78.228 51.711
X2 10 7 22 12.076 4.471
X3 10 6 40 18.06 8.874
Y1 10 293 716 471.701 110.761
Y2 10 51 544 297.025 119.131

Reliability test results

Potential variable Number of observed indicators Alpha Total Alpha
RP 3 0.836 0.916
RI 3 0.914
RA 3 0.963
RR 2 0.796
RM 3 0.805
CS 3 0.812