Research on optimisation of transformer manufacturing process and construction of smart factory based on digital twin technology
, , , oraz
03 lut 2025
O artykule
Data publikacji: 03 lut 2025
Otrzymano: 14 wrz 2024
Przyjęty: 19 gru 2024
DOI: https://doi.org/10.2478/amns-2025-0012
Słowa kluczowe
© 2025 Jiexuan Yang et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Yang, Jiexuan
Xi’an Xidian Transformer Co., LtdXi’an, China
He, Xuye
Xi’an Xidian Transformer Co., LtdXi’an, China
Zhang, Jian
China Electric Power Research InstituteBeijing, China
Wu, Xingwang
State Grid Anhui Electric Power Co., LtdHefei, China
Wang, Hong
Xi’an Xidian Transformer Co., LtdXi’an, China