Numerical modeling and fatigue analysis of the dynamic response of main pump cable in nuclear power plant
, , , , oraz
20 lip 2024
O artykule
Data publikacji: 20 lip 2024
Otrzymano: 24 mar 2024
Przyjęty: 22 cze 2024
DOI: https://doi.org/10.2478/amns-2024-1848
Słowa kluczowe
© 2024 Wang Jingqi et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Jingqi, Wang
Jiangsu Nuclear Power Corporation, LTDLianyungang, China
Lixia, Guo
Jiangsu Nuclear Power Corporation, LTDLianyungang, China
Wei, Liu
China Nuclear Power Operation Technology Corporation, LTDWuhan, China
Yadong, Wang
CNNP Operation Maintenance Technology Corporation, LTDHangzhou, China
Dongfang, Wu
CNNP Operation Maintenance Technology Corporation, LTDHangzhou, China
Zimeng, Chen
China Nuclear Power Operation Technology Corporation, LTDWuhan, China