Research on construction project cost budget and cost control based on matrix model
, e
23 ott 2023
INFORMAZIONI SU QUESTO ARTICOLO
Pubblicato online: 23 ott 2023
Ricevuto: 20 dic 2022
Accettato: 03 mag 2023
DOI: https://doi.org/10.2478/amns.2023.2.00759
Parole chiave
© 2023 Jingsi Yang et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Yang, Jingsi
Economic and Technological Research Institute, State Grid Heilongjiang Electric Power Co., LtdChina
Li, Zhenhai
Economic and Technological Research Institute, State Grid Heilongjiang Electric Power Co., LtdChina
Yang, Ge
Economic and Technological Research Institute, State Grid Heilongjiang Electric Power Co., LtdChina