Study on the impact of optimal design of internal space layout of pre-assembled substation on the stability of equipment operation
, , , et
17 mars 2025
À propos de cet article
Publié en ligne: 17 mars 2025
Reçu: 21 oct. 2024
Accepté: 07 févr. 2025
DOI: https://doi.org/10.2478/amns-2025-0195
Mots clés
© 2025 Jingchao Guo et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Guo, Jingchao
Construction Project Management Branch of National Petroleum and Natural Gas Pipeline Network Group Co., LtdLangfang, China
Li, Baojian
Construction Project Management Branch of National Petroleum and Natural Gas Pipeline Network Group Co., LtdLangfang, China
Jing, Huaiyi
Construction Project Management Branch of National Petroleum and Natural Gas Pipeline Network Group Co., LtdLangfang, China
Hu, Chunli
China Petroleum Pipeline Engineering CorporationLangfang, China
Lin, Sen
China Petroleum Pipeline Engineering CorporationLangfang, China