Construction of water supply and drainage fire water system of construction project under BIM technology
15 mai 2024
À propos de cet article
Publié en ligne: 15 mai 2024
Reçu: 11 janv. 2024
Accepté: 26 mars 2024
DOI: https://doi.org/10.2478/amns-2024-1104
Mots clés
© 2024 Xinyan Chen, published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Chen, Xinyan
South China University of Technology Architectural Design & Research Institute CO., LTDGuangzhou, China