Study on Electricity Settlement Mechanism Considering Competitiveness of Electricity Markets
y
29 sept 2025
Acerca de este artículo
Publicado en línea: 29 sept 2025
Recibido: 28 dic 2024
Aceptado: 23 abr 2025
DOI: https://doi.org/10.2478/amns-2025-1098
Palabras clave
© 2025 Fangping Gao et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Figure 1.

Figure 2.

Figure 3.

Figure 4.

Figure 5.

Figure 6.

Figure 7.

Figure 8.

Figure 9.

Benefits and partial costs in different scenarios
DNO | LA | DGO | |||||
---|---|---|---|---|---|---|---|
Profit/yuan | Call gas turbine cost / yuan | Purchase IL cost /yuan | Safeguard the cost of the power supply / yuan | Profit/ yuan | IL sells electrical benefits/ yuan | Profit/ yuan | |
Scene 1 | 2157.16 | 492.51 | 0 | 0 | 2074.31 | 0 | 2924.35 |
Scene 2 | 2341.52 | 468.84 | 0 | 0 | 2342.58 | 0 | 3116.24 |
Scene 3 | 2738.67 | 174.38 | 254.17 | 0 | 2617.63 | 254.17 | 3435.19 |
Tripartite game relationship
Players | |||
---|---|---|---|
Market transaction load number | DNO | DGO | LA |
8 | √ | × | √ |
24 | √ | √ | √ |
30 | √ | √ | × |
Air storage and optical storage system parameters
ID | Capacity/ (kW-kW·h) | Maximum charge and discharge power /kW | Minimum storage power / kW·h | Charge and discharge efficiency | Final period charge requirement / kW·h | |
---|---|---|---|---|---|---|
8 | PV-BESS | 550-800 | 50 | 120 | 0.9 | 400 |
24 | WG-BESS | 700-800 | 70 | 60 | 0.9 | 300 |
PV-BESS | 700-800 | 70 | 60 | 0.9 | 400 | |
30 | WG-BESS | 550-800 | 60 | 60 | 0.9 | 300 |
Other simulation example parameters
Algorithm | Average round total return |
Standard deviation of total return |
||
---|---|---|---|---|
DQN | 0.2617 | 0.04021 | 812.38 | 542.13 |
MADDPG | 0.2504 | 0.03257 | 2206.52 | 478.24 |