Multivariate model optimisation during the implementation of flexible interconnection projects for MV distribution networks
, , , , y
17 mar 2025
Acerca de este artículo
Publicado en línea: 17 mar 2025
Recibido: 05 nov 2024
Aceptado: 17 feb 2025
DOI: https://doi.org/10.2478/amns-2025-0186
Palabras clave
© 2025 Xing Su et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Su, Xing
State Grid Gansu Electric Power Company, Baiyin Power Supply CompanyBaiyin, China
Xu, Qing
State Grid Gansu Electric Power Company, Baiyin Power Supply CompanyBaiyin, China
Wei, Libao
State Grid Gansu Electric Power Company, Baiyin Power Supply CompanyBaiyin, China
Xin, Shijin
State Grid Gansu Electric Power Company, Baiyin Power Supply CompanyBaiyin, China
Hao, Guojie
State Grid Gansu Electric Power Company, Baiyin Power Supply CompanyBaiyin, China
Wang, Xiaofeng
State Grid Gansu Electric Power Company, Baiyin Power Supply CompanyBaiyin, China
