Construction and Optimization of Dynamic Assessment Indicators for Distribution Grid Carrying Capacity with High Proportion of Distributed Resource Connections
, , , , und
03. Juni 2024
Über diesen Artikel
Online veröffentlicht: 03. Juni 2024
Eingereicht: 07. Feb. 2024
Akzeptiert: 21. Apr. 2024
DOI: https://doi.org/10.2478/amns-2024-1352
Schlüsselwörter
© 2024 Zhongqiang Zhou et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
Zhou, Zhongqiang
Department of Automation, Dispatching & Control Center of Guizhou Power GridGuiyang, China
Wen, Yuan
Power Dispatching & Control Center, Kaili Power Supply Bureau of Guizhou Power GridKaili, China
Jiang, Dan
Power Dispatching & Control Center, Tongren Power Supply Bureau of Guizhou Power GridTongren, China
Deng, Ruifeng
Power Dispatching & Control Center, Xingyi Power Supply Bureau of Guizhou Power GridXingyi, China
Ma, Jianwei
Department of Automation, Dispatching & Control Center of Guizhou Power GridGuiyang, China
Meng, Jingrong
Shanghai Jiao Tong University Sichuan Research InstituteChengdu, China
