Calculation of line of site periods between two artificial satellites under the action air drag
, und
01. Juli 2018
Über diesen Artikel
Online veröffentlicht: 01. Juli 2018
Seitenbereich: 339 - 352
Eingereicht: 23. Jan. 2018
Akzeptiert: 20. Juni 2018
DOI: https://doi.org/10.21042/AMNS.2018.2.00027
Schlüsselwörter
© 2018 M. K. Ammar et al., published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.
In a previous (herein referred to as Ammar, Amin and Hassan Paper [1]) the statement of the problem was formulated and the basic visibility function between two satellites in terms of the orbital elements and time were derived. In this paper the perturbing effect due to drag force on the visibility function were derived explicitly up to