Skip to content
Search
English
English
Deutsch
Polski
Español
Français
Italiano
Home
Journals
Applied Mathematics and Nonlinear Sciences
Volume 8 (2023): Issue 2 (July 2023)
Open Access
Construction Cost Control and Management Based on Mapping Model and BIM
Wei Chenghui
Wei Chenghui
Chongqing Vocational College of Science and Creation
China
Search for this author on
Sciendo
|
Google Scholar
Chenghui, Wei
,
Chen Hao
Chen Hao
Chongqing Vocational College of Science and Creation
China
Search for this author on
Sciendo
|
Google Scholar
Hao, Chen
and
Wu Bin
Wu Bin
Chongqing Huayu Group Co., Ltd
Chongqing, China
Search for this author on
Sciendo
|
Google Scholar
Bin, Wu
Jun 22, 2023
Applied Mathematics and Nonlinear Sciences
Volume 8 (2023): Issue 2 (July 2023)
About this article
Previous Article
Next Article
Abstract
References
Authors
Articles in this Issue
Preview
PDF
Cite
Share
Download Cover
Published Online:
Jun 22, 2023
Page range:
2617 - 2626
Received:
Sep 06, 2022
Accepted:
Dec 30, 2022
DOI:
https://doi.org/10.2478/amns.2023.1.00442
Keywords
Highway engineering
,
BIM model
,
Mapping model
,
Particle swarm optimization
,
Decomposition and coding
,
Process inspection
© 2023 Wei Chenghui et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.