Open Access

Application of stochastic process modeling in the prediction of emergency response time for public emergencies

  
Mar 19, 2025

Cite
Download Cover

Figure 1.

Prediction sequence results
Prediction sequence results

Figure 2.

Comparison of the accuracy of the five prediction methods
Comparison of the accuracy of the five prediction methods

Figure 3.

Changes in concentration of water intake in each water plant
Changes in concentration of water intake in each water plant

Emergency time and impact duration of each water plant

Dry season Flood season
Emergency time/d Impact duration/d Emergency time/d Impact duration/d
Li Zuizi Water Plant 2.59 1.42 0.43 0.34
Fourth Municipal Water Plant 5.98 2.96 1.16 0.64
Third Municipal Water Plant 6.73 2.74 1.23 0.66
First Municipal Water Plant 6.98 2.98 1.35 0.53
Language:
English