A Lightweight Processing Method Towards Integrated Multi-demand in BIM
, , , , , and
Nov 18, 2024
About this article
Published Online: Nov 18, 2024
Received: Jul 05, 2024
Accepted: Oct 21, 2024
DOI: https://doi.org/10.2478/amns-2024-3361
Keywords
© 2024 Yahui Wang et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Wang, Yahui
Henan Industrial Technology Academy of Spatio-Temporal Big Data, Henan UniversityZhengzhou, China
Huang, Limin
State Key Laboratory of Geo-information EngineeringXi’an, China
Xu, Jian
State Key Laboratory of Geo-information EngineeringXi’an, China
An, Xiaoya
State Key Laboratory of Geo-information EngineeringXi’an, China
Li, Ziwei
Henan Industrial Technology Academy of Spatio-Temporal Big Data, Henan UniversityZhengzhou, China
Chen, Jianhua
Henan Industrial Technology Academy of Spatio-Temporal Big Data, Henan UniversityZhengzhou, China
Guo, Jianzhong
Henan Industrial Technology Academy of Spatio-Temporal Big Data, Henan UniversityZhengzhou, China