Engineering and Technical Research on Combined Application of Stormwater Regulation Pond and PP Modular Cistern in Wet Trapped Loess Area
, , and
Oct 04, 2024
About this article
Published Online: Oct 04, 2024
Received: May 13, 2024
Accepted: Sep 03, 2024
DOI: https://doi.org/10.2478/amns-2024-2673
Keywords
© 2024 Zhendong Liu et al., published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 International License.
Liu, Zhendong
China Construction Sixth Engineering Bureau Corp.Ltd, China
Li, Shuo
China Construction Sixth Engineering Bureau Corp.Ltd, China
Wu, Hui
China Construction Sixth Engineering Bureau Corp.Ltd, China
Yang, Kun
China Construction Sixth Engineering Bureau Corp.Ltd, China